Requirements - validation in software engineering | PPT
Slide 1
Requirements Validation
Slide 2
Validation objectives
 Certifies that the requirements document is an acceptable
description of the system to be implemented
 Checks a requirements document for
• Completeness and consistency
• Conformance to standards
• Requirements conflicts
• Technical errors
• Ambiguous requirements
Slide 3
Analysis and validation
 Analysis works with raw requirements as elicited from
the system stakeholders
• “Have we got the right requirements” is the key question to be
answered at this stage
 Validation works with a final draft of the requirements
document i.e. with negotiated and agreed requirements
• “Have we got the requirements right” is the key question to be
answered at this stage
Slide 4
Validation inputs and outputs
List of problems
Agreed actions
Requirements
document
Organisational
standards
Organisational
knowledge
Requirements
validation
Slide 5
Validation inputs
 Requirements document
• Should be a complete version of the document, not an unfinished draft.
Formatted and organised according to organisational standards
 Organisational knowledge
• Knowledge, often implicit, of the organisation which may be used to
judge the realism of the requirements
 Organisational standards
• Local standards e.g. for the organisation of the requirements document
Slide 6
Validation outputs
 Problem list
• List of discovered problems in the requirements document
 Agreed actions
• List of agreed actions in response to requirements problems. Some
problems may have several corrective actions; some problems may
have no associated actions
Slide 7
Requirements reviews
 A group of people read and analyse the requirements,
look for problems, meet and discuss the problems and
agree on actions to address these problems
Slide 8
Requirements review process
Plan review
Distribute
documents
Prepare for
review
Hold review
meeting
Follow-up
actions
Revise
document
Slide 9
Review activities
 Plan review
• The review team is selected and a time and place for the review meeting is
chosen.
 Distribute documents
• The requirements document is distributed to the review team members
 Prepare for review
• Individual reviewers read the requirements to find conflicts, omissions,
inconsistencies, deviations from standards and other problems.
Slide 10
Review activities
 Hold review meeting
• Individual comments and problems are discussed and a set of actions
to address the problems is agreed.
 Follow-up actions
• The chair of the review checks that the agreed actions have been
carried out.
 Revise document
• The requirements document is revised to reflect the agreed actions. At
this stage, it may be accepted or it may be re-reviewed
Slide 11
Problem actions
 Requirements clarification
• The requirement may be badly expressed or may have accidentally omitted
information which has been collected during requirements elicitation.
 Missing information
• Some information is missing from the requirements document. It is the
responsibility of the requirements engineers who are revising the document to
discover this information from system stakeholders.
 Requirements conflict
• There is a significant conflict between requirements. The stakeholders involved
must negotiate to resolve the conflict.
 Unrealistic requirement
• The requirement does not appear to be implementable with the technology available
or given other constraints on the system. Stakeholders must be consulted to decide
how to make the requirement more realistic.
Slide 12
Pre-review checking
 Reviews are expensive because they involve a number of
people spending time reading and checking the
requirements document
 This expense can be reduced by using pre-review
checking where one person checks the document and
looks for straightforward problems such as missing
requirements, lack of conformance to standards,
typographical errors, etc.
 Document may be returned for correction or the list of
problems distributed to other reviewers
Slide 13
Pre-review checking
Requirements
document
Problem report
Check
document
completeness
Check document
against
standards
Check document
structure
Run
automatic
checkers
Slide 14
Review team membership
 Reviews should involve a number of stakeholders drawn
from different backgrounds
• People from different backgrounds bring different skills and
knowledge to the review
• Stakeholders feel involved in the RE process and develop an
understanding of the needs of other stakeholders
 Review team should always involve at least a domain
expert and an end-user
Slide 15
Review checklists
 Understandability
• Can readers of the document understand what the requirements mean?
 Redundancy
• Is information unnecessarily repeated in the requirements document?
 Completeness
• Does the checker know of any missing requirements or is there any
information missing from individual requirement descriptions?
 Ambiguity
• Are the requirements expressed using terms which are clearly defined?
Could readers from different backgrounds make different
interpretations of the requirements?
Slide 16
Review checklists
 Consistency
• Do the descriptions of different requirements include contradictions? Are there
contradictions between individual requirements and overall system
requirements?
 Organisation
• Is the document structured in a sensible way? Are the descriptions of
requirements organised so that related requirements are grouped?
 Conformance to standards
• Does the requirements document and individual requirements conform to
defined standards? Are departures from the standards, justified?
 Traceability
• Are requirements unambiguously identified, include links to related
requirements and to the reasons why these requirements have been included?
Slide 17
Checklist questions
 Is each requirement uniquely identified?
 Are specialised terms defined in the glossary
 Does a requirement stand on its own or do you have to examine
other requirements to understand what it means?
 Do individual requirements use the terms consistently
 Is the same service requested in different requirements? Are there
any contradictions in these requests?
 If a requirement makes reference to some other facilities, are
these described elsewhere in the document?
 Are related requirements grouped together? If not, do they refer to
each other?
Slide 18
Requirements problem example
 “4. EDDIS will be configurable so that it will comply
with the requirements of all UK and (where relevant)
international copyright legislation. Minimally, this means
that EDDIS must provide a form for the user to sign the
Copyright Declaration statement. It also means that
EDDIS must keep track of Copyright Declaration
statements which have been signed/not-signed. Under no
circumstances must an order be sent to the supplier if the
copyright statement has not been signed.”
Slide 19
Problems
 Incompleteness
• What international copyright legislation is relevant?
• What happens if the copyright declaration is not signed?
• If a signature is a digital signature, how is it assigned?
 Ambiguity
• What does signing an electronic form mean? Is this a physical
signature or a digital signature?
 Standards
• More than 1 requirement. Maintenance of copyright is one
requirement; issue of documents is another
Slide 20
Prototyping
 Prototypes for requirements validation demonstrate the
requirements and help stakeholders discover problems
 Validation prototypes should be complete, reasonably
efficient and robust. It should be possible to use them in
the same way as the required system
 User documentation and training should be provided
Slide 21
Prototyping for validation
Choose
prototype
testers
Document and extend prototype system
Develop
test
scenarios
Execute
scenarios
Document
problems
Slide 22
Prototyping activities
 Choose prototype testers
• The best testers are users who are fairly experienced and who are open-minded about
the use of new systems. End-users who do different jobs should be involved so that
different areas of system functionality will be covered.
 Develop test scenarios
• Careful planning is required to draw up a set of test scenarios which provide broad
coverage of the requirements. End-users shouldn’t just play around with the system as
this may never exercise critical system features.
 Execute scenarios
• The users of the system work, usually on their own, to try the system by executing the
planned scenarios.
 Document problems
• Its usually best to define some kind of electronic or paper problem report form which
users fill in when they encounter a problem.
Slide 23
User manual development
 Writing a user manual from the requirements forces a
detailed requirements analysis and thus can reveal
problems with the document
 Information in the user manual
• Description of the functionality and how it is implemented
• Which parts of the system have not been implemented
• How to get out of trouble
• How to install and get started with the system
Slide 24
Model validation
 Validation of system models is an essential part of the
validation process
 Objectives of model validation
• To demonstrate that each model is self-consistent
• If there are several models of the system, to demonstrate that these are
internally and externally consistent
• To demonstrate that the models accurately reflect the real requirements
of system stakeholders
 Some checking is possible with automated tools
 Paraphrasing the model is an effective checking technique
Slide 25
Requirements testing
 Each requirement should be testable i.e. it should be
possible to define tests to check whether or not that
requirement has been met.
 Inventing requirements tests is an effective validation
technique as missing or ambiguous information in the
requirements description may make it difficult to
formulate tests
 Each functional requirement should have an associated
test
Slide 26
Test case definition
 What usage scenario might be used to check the
requirement?
 Does the requirement, on its own, include enough
information to allow a test to be defined?
 Is it possible to test the requirement using a single test or
are multiple test cases required?
 Could the requirement be re-stated to make the test cases
more obvious?
Slide 27
Test record form
 The requirement’s identifier
• There should be at least one for each requirement.
 Related requirements
• These should be referenced as the test may also be relevant to these requirements.
 Test description
• A brief description of the test and why this is an objective requirements test. This
should include system inputs and corresponding outputs.
 Requirements problems
• A description of problems which made test definition difficult or impossible.
 Comments and recommendations
• These are advice on how to solve requirements problems which have been
discovered.
Slide 28
Requirements test form
Requirements tested: 10.(iv)
Related requirements: 10.(i), 10.(ii), 10.(iii),
10.(vi), 10. (vii)
Test applied: For each class of user, prepare
a login script and identify theservices expected
for that class of user.
The results of the login should be a web page
with a menu of available services.
Requirements problems: We don't know the
different classes of EDDIS user and the
services which areavailableto each user class.
Apart from the administrator, are all other
EDDIS users in the same class?
Recommendations: Explicitly list all user
classes and the services which they can access.
Slide 29
Hard-to-test requirements
 System requirements
• Requirements which apply to the system as a whole. In general, these are the
most difficult requirements to validate irrespective of the method used as they
may be influenced by any of the functional requirements. Tests, which are not
executed, cannot test for non-functional system-wide characteristics such as
usability.
 Exclusive requirements
• These are requirements which exclude specific behaviour. For example, a
requirement may state that system failures must never corrupt the system
database. It is not possible to test such a requirement exhaustively.
 Some non-functional requirements
• Some non-functional requirements, such as reliability requirements, can only be
tested with a large test set. Designing this test set does not help with
requirements validation.
Slide 30
Key points
 Requirements validation should focus on checking the final draft
of the requirements document for conflicts, omissions and
deviations from standards.
 Inputs to the validation process are the requirements document,
organisational standards and implicit organisational knowledge.
The outputs are a list of requirements problems and agreed actions
to address these problems.
 Reviews involve a group of people making a detailed analysis of
the requirements.
 Review costs can be reduced by checking the requirements before
the review for deviations from organisational standards. These
may result from more serious requirements problems.
Slide 31
Key points
 Checklists of what to look for may be used to drive a
requirements review process.
 Prototyping is effective for requirements validation if a
prototype has been developed during the requirements
elicitation stage.
 Systems models may be validated by paraphrasing them. This
means that they are systematically translated into a natural
language description.
 Designing tests for requirements can reveal problems with the
requirements. If the requirement is unclear, it may be
impossible to define a test for it.

Requirements - validation in software engineering

  • 1.
  • 2.
    Slide 2 Validation objectives Certifies that the requirements document is an acceptable description of the system to be implemented  Checks a requirements document for • Completeness and consistency • Conformance to standards • Requirements conflicts • Technical errors • Ambiguous requirements
  • 3.
    Slide 3 Analysis andvalidation  Analysis works with raw requirements as elicited from the system stakeholders • “Have we got the right requirements” is the key question to be answered at this stage  Validation works with a final draft of the requirements document i.e. with negotiated and agreed requirements • “Have we got the requirements right” is the key question to be answered at this stage
  • 4.
    Slide 4 Validation inputsand outputs List of problems Agreed actions Requirements document Organisational standards Organisational knowledge Requirements validation
  • 5.
    Slide 5 Validation inputs Requirements document • Should be a complete version of the document, not an unfinished draft. Formatted and organised according to organisational standards  Organisational knowledge • Knowledge, often implicit, of the organisation which may be used to judge the realism of the requirements  Organisational standards • Local standards e.g. for the organisation of the requirements document
  • 6.
    Slide 6 Validation outputs Problem list • List of discovered problems in the requirements document  Agreed actions • List of agreed actions in response to requirements problems. Some problems may have several corrective actions; some problems may have no associated actions
  • 7.
    Slide 7 Requirements reviews A group of people read and analyse the requirements, look for problems, meet and discuss the problems and agree on actions to address these problems
  • 8.
    Slide 8 Requirements reviewprocess Plan review Distribute documents Prepare for review Hold review meeting Follow-up actions Revise document
  • 9.
    Slide 9 Review activities Plan review • The review team is selected and a time and place for the review meeting is chosen.  Distribute documents • The requirements document is distributed to the review team members  Prepare for review • Individual reviewers read the requirements to find conflicts, omissions, inconsistencies, deviations from standards and other problems.
  • 10.
    Slide 10 Review activities Hold review meeting • Individual comments and problems are discussed and a set of actions to address the problems is agreed.  Follow-up actions • The chair of the review checks that the agreed actions have been carried out.  Revise document • The requirements document is revised to reflect the agreed actions. At this stage, it may be accepted or it may be re-reviewed
  • 11.
    Slide 11 Problem actions Requirements clarification • The requirement may be badly expressed or may have accidentally omitted information which has been collected during requirements elicitation.  Missing information • Some information is missing from the requirements document. It is the responsibility of the requirements engineers who are revising the document to discover this information from system stakeholders.  Requirements conflict • There is a significant conflict between requirements. The stakeholders involved must negotiate to resolve the conflict.  Unrealistic requirement • The requirement does not appear to be implementable with the technology available or given other constraints on the system. Stakeholders must be consulted to decide how to make the requirement more realistic.
  • 12.
    Slide 12 Pre-review checking Reviews are expensive because they involve a number of people spending time reading and checking the requirements document  This expense can be reduced by using pre-review checking where one person checks the document and looks for straightforward problems such as missing requirements, lack of conformance to standards, typographical errors, etc.  Document may be returned for correction or the list of problems distributed to other reviewers
  • 13.
    Slide 13 Pre-review checking Requirements document Problemreport Check document completeness Check document against standards Check document structure Run automatic checkers
  • 14.
    Slide 14 Review teammembership  Reviews should involve a number of stakeholders drawn from different backgrounds • People from different backgrounds bring different skills and knowledge to the review • Stakeholders feel involved in the RE process and develop an understanding of the needs of other stakeholders  Review team should always involve at least a domain expert and an end-user
  • 15.
    Slide 15 Review checklists Understandability • Can readers of the document understand what the requirements mean?  Redundancy • Is information unnecessarily repeated in the requirements document?  Completeness • Does the checker know of any missing requirements or is there any information missing from individual requirement descriptions?  Ambiguity • Are the requirements expressed using terms which are clearly defined? Could readers from different backgrounds make different interpretations of the requirements?
  • 16.
    Slide 16 Review checklists Consistency • Do the descriptions of different requirements include contradictions? Are there contradictions between individual requirements and overall system requirements?  Organisation • Is the document structured in a sensible way? Are the descriptions of requirements organised so that related requirements are grouped?  Conformance to standards • Does the requirements document and individual requirements conform to defined standards? Are departures from the standards, justified?  Traceability • Are requirements unambiguously identified, include links to related requirements and to the reasons why these requirements have been included?
  • 17.
    Slide 17 Checklist questions Is each requirement uniquely identified?  Are specialised terms defined in the glossary  Does a requirement stand on its own or do you have to examine other requirements to understand what it means?  Do individual requirements use the terms consistently  Is the same service requested in different requirements? Are there any contradictions in these requests?  If a requirement makes reference to some other facilities, are these described elsewhere in the document?  Are related requirements grouped together? If not, do they refer to each other?
  • 18.
    Slide 18 Requirements problemexample  “4. EDDIS will be configurable so that it will comply with the requirements of all UK and (where relevant) international copyright legislation. Minimally, this means that EDDIS must provide a form for the user to sign the Copyright Declaration statement. It also means that EDDIS must keep track of Copyright Declaration statements which have been signed/not-signed. Under no circumstances must an order be sent to the supplier if the copyright statement has not been signed.”
  • 19.
    Slide 19 Problems  Incompleteness •What international copyright legislation is relevant? • What happens if the copyright declaration is not signed? • If a signature is a digital signature, how is it assigned?  Ambiguity • What does signing an electronic form mean? Is this a physical signature or a digital signature?  Standards • More than 1 requirement. Maintenance of copyright is one requirement; issue of documents is another
  • 20.
    Slide 20 Prototyping  Prototypesfor requirements validation demonstrate the requirements and help stakeholders discover problems  Validation prototypes should be complete, reasonably efficient and robust. It should be possible to use them in the same way as the required system  User documentation and training should be provided
  • 21.
    Slide 21 Prototyping forvalidation Choose prototype testers Document and extend prototype system Develop test scenarios Execute scenarios Document problems
  • 22.
    Slide 22 Prototyping activities Choose prototype testers • The best testers are users who are fairly experienced and who are open-minded about the use of new systems. End-users who do different jobs should be involved so that different areas of system functionality will be covered.  Develop test scenarios • Careful planning is required to draw up a set of test scenarios which provide broad coverage of the requirements. End-users shouldn’t just play around with the system as this may never exercise critical system features.  Execute scenarios • The users of the system work, usually on their own, to try the system by executing the planned scenarios.  Document problems • Its usually best to define some kind of electronic or paper problem report form which users fill in when they encounter a problem.
  • 23.
    Slide 23 User manualdevelopment  Writing a user manual from the requirements forces a detailed requirements analysis and thus can reveal problems with the document  Information in the user manual • Description of the functionality and how it is implemented • Which parts of the system have not been implemented • How to get out of trouble • How to install and get started with the system
  • 24.
    Slide 24 Model validation Validation of system models is an essential part of the validation process  Objectives of model validation • To demonstrate that each model is self-consistent • If there are several models of the system, to demonstrate that these are internally and externally consistent • To demonstrate that the models accurately reflect the real requirements of system stakeholders  Some checking is possible with automated tools  Paraphrasing the model is an effective checking technique
  • 25.
    Slide 25 Requirements testing Each requirement should be testable i.e. it should be possible to define tests to check whether or not that requirement has been met.  Inventing requirements tests is an effective validation technique as missing or ambiguous information in the requirements description may make it difficult to formulate tests  Each functional requirement should have an associated test
  • 26.
    Slide 26 Test casedefinition  What usage scenario might be used to check the requirement?  Does the requirement, on its own, include enough information to allow a test to be defined?  Is it possible to test the requirement using a single test or are multiple test cases required?  Could the requirement be re-stated to make the test cases more obvious?
  • 27.
    Slide 27 Test recordform  The requirement’s identifier • There should be at least one for each requirement.  Related requirements • These should be referenced as the test may also be relevant to these requirements.  Test description • A brief description of the test and why this is an objective requirements test. This should include system inputs and corresponding outputs.  Requirements problems • A description of problems which made test definition difficult or impossible.  Comments and recommendations • These are advice on how to solve requirements problems which have been discovered.
  • 28.
    Slide 28 Requirements testform Requirements tested: 10.(iv) Related requirements: 10.(i), 10.(ii), 10.(iii), 10.(vi), 10. (vii) Test applied: For each class of user, prepare a login script and identify theservices expected for that class of user. The results of the login should be a web page with a menu of available services. Requirements problems: We don't know the different classes of EDDIS user and the services which areavailableto each user class. Apart from the administrator, are all other EDDIS users in the same class? Recommendations: Explicitly list all user classes and the services which they can access.
  • 29.
    Slide 29 Hard-to-test requirements System requirements • Requirements which apply to the system as a whole. In general, these are the most difficult requirements to validate irrespective of the method used as they may be influenced by any of the functional requirements. Tests, which are not executed, cannot test for non-functional system-wide characteristics such as usability.  Exclusive requirements • These are requirements which exclude specific behaviour. For example, a requirement may state that system failures must never corrupt the system database. It is not possible to test such a requirement exhaustively.  Some non-functional requirements • Some non-functional requirements, such as reliability requirements, can only be tested with a large test set. Designing this test set does not help with requirements validation.
  • 30.
    Slide 30 Key points Requirements validation should focus on checking the final draft of the requirements document for conflicts, omissions and deviations from standards.  Inputs to the validation process are the requirements document, organisational standards and implicit organisational knowledge. The outputs are a list of requirements problems and agreed actions to address these problems.  Reviews involve a group of people making a detailed analysis of the requirements.  Review costs can be reduced by checking the requirements before the review for deviations from organisational standards. These may result from more serious requirements problems.
  • 31.
    Slide 31 Key points Checklists of what to look for may be used to drive a requirements review process.  Prototyping is effective for requirements validation if a prototype has been developed during the requirements elicitation stage.  Systems models may be validated by paraphrasing them. This means that they are systematically translated into a natural language description.  Designing tests for requirements can reveal problems with the requirements. If the requirement is unclear, it may be impossible to define a test for it.